THE
ARALLAS-SPECIFICATION OF SEMI-FINISHED APARTMENTS |
| STRUCTURE |
| RCC-framed
structure |
: |
Designed
for Zone-5 as per IS code No.IS-1893 (PART-1): 2002 for earthquake
resistance in structure |
| COMMON
AREAS |
|
|
| FLOORS |
|
|
Building
entrance hall & main lift lobbies
|
: |
Combination
of marble & granite
|
| staircases/service
lift lobby |
: |
Terrazzo/stone
|
| WALLS |
|
|
| Building
Facade |
: |
Exterior
paint |
| Building
entrance hall main lift lobbies |
: |
Combination
of marble /granite ceramic &
cladding, plaster with acrylic emulsion paint |
| Staircases/service
lifts |
: |
Plaster
with paints |
| |
|
|
| APARTMENT
AREAS: |
|
|
| FLOORS |
|
|
| All
internal spaces in the apartment,decks, balconies |
: |
Bare
concrete/IPS |
| WALLS |
|
|
| All
internal walls within the apartment |
: |
Rough
plastered and unpainted |
| DOORS
& WINDOWS |
|
|
| Doors
frames & internal door shutters |
: |
No
internal door frames and door shutter will be provided |
Entrance
door(main entrance
& service entrance doors) |
: |
commercial
flush shutter/mounded skin doors with padlock |
| External
doors & windows |
: |
Aluminum
frames and shutters. fly mesh shutter limited to a portion of
openable
windows area only |
| Hardware |
: |
Brass/steel/powder
coated aluminum /anodized aluminum |
| Bathrooms/kitchen
|
: |
Similar
to other rooms will not be finished any further |
| |
|
|
| SERVICE |
|
|
| |
|
|
| ELECTRICAL |
: |
Only
PVC conduits will be provided in the ceiling slabs up to drop
points |
| |
|
Back-up
power of 30 KVA per apartment considering 70% load factor, however
dg set capacity calculation shall take into account suitable
overall diversity of 60% |
| |
|
No
light points/fixtures/ switches will be provided |
| |
|
|
| PLUMBING/SANITATION
|
: |
Vertical
stacks for water supply and drainage will be provided in the
shafts with connecting points provided in the toilets/kitchens |
| |
: |
Limited
copper piping for the connecting points only |
| |
: |
Internal
distribution of waster supply and drainage will be done by the
customer according to the internal layouts at his own cost |
| |
: |
Water
softening plant for the complex. |
| FIRE
FIGHTING/DETECTION SYSTEM |
: |
Fire
fighting including sprinklers and detection system shall be
provided as per NBC norms-part IV SP-7 amendment No. 3,January
1997 |
| LIFTS |
: |
Two
numbers of passengers lifts and one service lifts will be provided
per tower, serving the basements as well |
| CLUB
FACILITY |
: |
Multipurpose
room, swimming pool & change rooms one squash court, two
tennis courts, gymnasium, steam & sauna, panty, pool table,
Laundromat, security control room, convenience shop & centralized
services.(Facilities are indicative only, subject to change) |
| GENERAL |
: |
Car
calling system. Car washing facility within the complex. Facility
for crèche/ play school with playground. |
| |
: |
Security
system-CCTV’s / monitoring of limited portion of exteriors,
periphery, entrance lobbies & the basement. |
| |
| It
is clarified that this being a semi-finished apartment, following
finishing items will NOT be provide inside the Apartment : |
| 1. |
Flooring in all the areas. |
| 2. |
2.
Final plastering/ pumping/ paint/ tiling / cladding on
all walls in the room. |
| 3. |
3.
Internal door frames and shutters. |
| 4. |
4.
All the counters, sanitary fixtures, fitting and accessories
in the toilets & kitchen. |
| 5. |
5.
Conducting in the wall for drainage inside the toilet
floors to the connecting point in the vertical stacks;
copper pipes in the walls for water supply from the water
supply risers. |
| 6. |
6.
Any false ceiling within the Apartment. |
| 7. |
7.
Any other finishing items. |
| |
|
| Thus
substantial additional work is required to be done by
the customer at his own cost direction in order to make
the Apartment livable. The customer will have to submit
proposed details of interior works and obtain prior approval
of DLF before starting the within the Apartment. |
|